Current Service Notifications
Announcements and information concerning our services.
| State | Date | Description | |
|---|---|---|---|
![]() | 22.04.2026 09:58 | Voicemail failure | Detailsadd |
Voicemail failureDue to a communication issue with the Microsoft Cloud, voicemail is currently unavailable. |
|||
![]() | 23.03.2026 11:13 | Performance issues Gitlab | Detailsadd |
Performance issues GitlabWe are experiencing performance issues on Gitlab at the moment. |
|||
| Date | Description | ||
|---|---|---|---|
| 30.04.2026 10:35 | Security Advisory – Copy Fail (CVE-2026-31431) | Detailsadd | |
Security Advisory – Copy Fail (CVE-2026-31431)Security Advisory – Copy Fail (CVE-2026-31431) Overview The “Copy Fail” (CVE-2026-31431) vulnerability is a critical local privilege escalation (LPE) in the Linux kernel. This allows a local user to gain root privileges with a high degree of reliability. Measures (Priority: High) Apply kernel updates (urgent)
As of now (30 April 2026, 10:40), there are no kernel updates available to apply. For this reason, a temporary workaround must be applied until kernel updates are available. We have published further details and steps to take on the following page: https://unlimited.ethz.ch/spaces/CISEC/pages/465011850/Security+Advisory+–+Copy+Fail+CVE-2026-31431 References: https://security-hub.ncsc.admin.ch/#/posts/12532 |
|||
| 22.04.2026 10:12 | Phishing "Action Needed: Outgoing/Incoming emails blocked" | Detailsadd | |
Phishing "Action Needed: Outgoing/Incoming emails blocked" Phishing mails with the subject "Action Needed: Outgoing/Incoming emails blocked" are currently in circulation. An ETH professor is mentioned as sender, but the senderaddress is most likely from gmail. Please ignore and delete these emails. |
|||
| Start | End | Description | |
|---|---|---|---|
| 08.05.2026 16:00 | 10.05.2026 22:00 | Annual SAP/ETHIS system upgrade | Detailsadd |
Annual SAP/ETHIS system upgradeETHIS and SAP systems will be unavailable due to a system upgrade from Friday, 08 May 2026, starting at 4:00 p.m., until Sunday, 10 May 2026, 10:00 p.m. |
|||
| 07.05.2026 00:00 | 07.05.2026 06:00 | Emergency power test "ENTIRE IRCHEL CAMPUS" (including ETH buildings) | Detailsadd |
Emergency power test "ENTIRE IRCHEL CAMPUS" (including ETH buildings)This is a message from the University of Zurich (UZH): |
|||
| 06.05.2026 06:00 | 27.05.2026 09:00 | Strom/Netzwerkunterbruch zwischen Mittwoch, 06.05.2026 und Mittwoch, 27.05.26 in den Gebäuden HIB / HIG | Detailsadd |
Strom/Netzwerkunterbruch zwischen Mittwoch, 06.05.2026 und Mittwoch, 27.05.26 in den Gebäuden HIB / HIG
|
|||
| 04.05.2026 07:00 | 05.05.2026 16:00 | Wi-Fi upgrade in the building RZ | Detailsadd |
Wi-Fi upgrade in the building RZOn Monday and Tuesday, May 4th and 5th, 2026, from approximately 07:30 to 16:00 each day, there will be brief interruptions in the RZ building during the replacement of the access points (hardware upgrade of WLAN transmitters). |
|||
| 04.05.2026 07:00 | 04.05.2026 16:00 | WLAN Upgrade im Gebäude OCT/F | Detailsadd |
WLAN Upgrade im Gebäude OCT/F |
|||
| 29.04.2026 08:00 | 13.05.2026 16:00 | WLAN Upgrade im Gebäude HIL | Detailsadd |
WLAN Upgrade im Gebäude HILFrom Wednesday, April 29, to Wednesday, May 13, 2026, there will be brief local interruptions between 8:00 a.m. and 4:00 p.m. on floors E and F of the HIL building while the access points are being replaced (hardware upgrade of Wi-Fi transmitters). |
|||
| 29.04.2026 07:00 | 29.04.2026 08:30 | Power/network outage Wednesday, April 29, 2026 from 07:00 to 08:30 in the STF building | Detailsadd |
Power/network outage Wednesday, April 29, 2026 from 07:00 to 08:30 in the STF buildingOn Wednesday, April 29, 2026, there will be a power outage in the STF building due to repair work. |
|||
| 31.03.2026 08:30 | 31.05.2026 12:00 | Strom/Netzwerkunterbruch Dienstag 31.03.2026 von 08:30 bis 12:00 im Gebäude HEZ | Detailsadd |
Strom/Netzwerkunterbruch Dienstag 31.03.2026 von 08:30 bis 12:00 im Gebäude HEZ
On Tuesday, March 31, 2026, there will be intermittent power outages in HEZ E 33 and the connected rooms due to the replacement of a circuit breaker. |
|||
| 02.03.2026 09:23 | 06.05.2026 18:00 | Euler maintenance | Detailsadd |
Euler maintenanceCSCS informed us that the data center will be undergoing a site-wide cooling maintenance on Wednesday 3 March 2026. Therefore the Euler cluster will be offline from 3. March 2025, 3pm until the afternoon of the 6. March 2026: |
|||

